Ongoing
Completed

Slipways
Completed, ConstructionNavy- Renovation of Number 3 Slipway Underwater Railway Path at Sri Lanka Navy Dockyard,

Log Gates at CDL, Colombo port
Completed, ConstructionThe Design and Construction of Intermediate Gate at Dock NO 1 at Colombo Dockyard

250 ton Bollard Testing Facility for CDL at Trincomalee
Completed, ConstructionCommenced on the 16/03/2011, the 250 ton Bollard at Trincomalee Harbour was completed by

Land Reclamation – Prima facility Trincomalee
Completed, ConstructionNeat Solutions (PVT) ltd has taken over land reclamation work at Prima facility In

Development of container unloading bays – Maho & Trincomalee
Completed, ConstructionTo fulfill the requirement arisen with commencement of rail freight transportation of coal, container

Harbour Dredging project – Delft Harbour, Jaffna
Completed, ConstructionNeat Solutions (PVT) ltd successfully completed Delft harbour dredging and construction of pier projects
Ongoing
Completed

Design and Consultancy for construction of inland container handling terminal facility for K Port (PVT) ltd at Orugodawatta.
Completed, Consultancy
Management consultancy in section 03 of A9 road construction, Jaffna.
Completed, ConsultancyThe ADB Funded Road Network Improvement Project- Rehabilitation in Jaffna-Kandy (A9) Road in Northern

Design and Consultancy of Mini Hydro Power Plant at Nayagan Ga, Deraniyagala.
Completed, ConsultancyNeat Solutions (Pvt) Ltd was the consult for the civil structures of Atabage Mini

Designing of 1500 ton Slipway for Gulf Shipyard (PVT) ltd, 1200 ton Slipway for CDL at port of Colombo and 200 ton Slipway for Sri Lankan Navy at Galle.
Completed, Consultancy
Consultancy for USAID/OTI program for total work of US$ 9 million with construction projects island wide in Sri Lanka during 2006-08
Completed, ConsultancyThis project was executed during the period of June 09, 2006 and August 30,
Ongoing
Completed

Marine construction – Club Bentota
Completed, MarineReconstruction of River Restaurant at Club Bentota Hotel, Bentota Work was completed as per

Implementation and maintenance of silt curtain – Prima
Completed, MarineFor the first time in Sri Lanka, our diving team implemented and maintained a

Randenigala bottom outlet
Completed, MarineEquipped with umbilical codes and high tech underwater cameras, Neat Solutions (PVT) ltd diving team
Ongoing

Rail Freight transport
Logistics, OngoingAs an effort to upgrade logistics in Sri Lanka, we have invested and transport

In-road Logistics
Logistics, OngoingUnloaded bulk cargo are delivered to our clients all around the country from warehouses

Ships Unloading Operation
Logistics, OngoingWe currently engage in unloading (bulk cargo handling) coal, gypsum and clinker at Trincomalee
Completed

Ongoing
Completed

Bay Breeze – China Bay
Completed, Surveying and DrillingThe Bay Breeze bungalows in China Bay, Trincomalee is a masterpiece holiday resort that

Soil Investigations at Moragahakanda (Elahera)
Completed, Surveying and DrillingThe consultancy assignment of surveying, investigation, designing and preparation of bill of quantities cost

Bathymetric surveying at Delf (Jaffna)
Completed, Surveying and Drilling
Soil investigations at Mankulam (Vavuniya)
Completed, Surveying and Drilling
Geological survey at Cod bay (Trincomalee)
Completed, Surveying and Drilling
Geological survey at Dikkowita fisheries harbour
Completed, Surveying and DrillingThe amounted sum for this project is 692480/=

Lanka Hydraulic Institute respectively.
Completed, Surveying and Drilling
Feasibility study including Geo Technical and Bathymetric surveying for Naval Pier at Trincomalee for SL Navy.
Completed, Surveying and Drilling
70 nos bridges in North and East for Mabey & Johnson Company (UK).
Completed, Surveying and DrillingWe undertook geo-technical investigations and topographical surveys of bridge sites at 70 different individual

Irakkakandi, Podduwekattu and Yanoya bridges in Trincomalee district for UNOPS.
Completed, Surveying and Drilling
Ralkuli, Kalankerny and Verugal bridges for China Harbour Engineering Company.
Completed, Surveying and Drilling
Geological survey Weras Ganga Flood control project, Mattala to Hambantota highway.
Completed, Surveying and DrillingOngoing
Completed
Ongoing
Completed

Introduction of renewable energy
Completed, ResearchResearch on Potential for introduction of renewable energy to Sri Lankan Commercial Markets. Study

Renewable Energy Production
Completed, ResearchResearch on renewable energy production has been one of our major interests. We initiated

Plantation of Cassava and Production of Cassava Flour
Completed, ResearchA feasibility study on Plantation and Production of cassava and cassava flour in which